Residential Garage, Whitewater, WI

FORTECO® team used well thought out engineering to create framing panels that built the garage quickly and in cost-effective way.

Step 1: Garage Structure using FORTECO Panels

FORTECO® team engineered and assembled the framing panels for the walls and roof of the Whitewater Garage. See the Garage structure built by placing assembled framing panels in the video below.

Step 2: Structure Ready on Site to Pour Concrete

Lightweight FORTECO® panels are easy to handle and secure in place. With integrated insulation foam and support with beams and re-bars, construction team got the structure quickly ready to pour concrete.

Step 3: Pouring of Concrete

Step 3: Completing Construction with Roof

Concrete poured to build the roof of the building.

With easy access and support for running electrical wiring and hanging dry walls, the garage construction was complete very easily.

 

Posted in Basement Walls, Lightweight Composite Framing.

2 Comments

    • Hello,
      It is difficult to provide a schedule for a project without seeing plans, the site conditions and knowing what time of year it will be built. Usually we can build walls in about the same time it takes concrete companies to set up and pour regular concrete walls. The floors go fast, a couple days to set floor joists and then a concrete company can pour the topping. Hope this helps, please contact me if you are interested in having me look at your project.
      Thank you
      Jim Jendusa, P.E.
      Forteco Framing, Co.